Principal Contractor Site Induction Package
Helps a principal contractor meet its induction duties under WHS Regulation 2025 (NSW) Part 6.4 (ss 309, 310, 312) and Part 6.5 (s 317) with a complete site-specific induction suite: an editable 24-slide deck with speaker notes, a 17-page handbook for the person giving the induction, and a two-page handout for every worker. Covers verification of general construction induction (White Card, CPCCWHS1001) cards and licences, emergency and muster procedures, protective equipment, high risk construction work and permits, mobile plant and traffic, hazardous chemicals, silica and asbestos, and consultation. Supported by worker declarations, a SWMS acknowledgement, and induction and site access registers. It delivers the site-specific induction; it does not replace White Card training.
What's included
Document details
Other documents in this system
Contractor Non-Conformance & Stop Work Notice Kit
Imminent danger stop-work notices and 3-tier corrective action workflows, built on the contract and WHS Act sections 19, 20, 84 & 85.
$290 βContractor Management Policy & Code of Practice
The governing policy plus the on-the-ground rules and conduct standards contractors must follow.
$250 βContractor Insurance & License Compliance Register ($20M Public Liability, Workers Comp, PI)
Live multi-tier tracker verifying $20M public liability, statutory workers compensation, PI, and trade licenses with automated expiry alerts.
$250 βLegal Compliance Matrix (Australia)
Every key obligation mapped across all eight Australian states and territories.
$350 βComplete bundle
All eight documents together.
$1,570 βEditable templates only. Not legal, safety or professional advice. No warranty of compliance. To the maximum extent permitted by law, liability is excluded and limited to the price paid. Rights that cannot lawfully be excluded are preserved.